Sectors
Neat Wall
1
2
3
Neat Wall 1 / 2
  • SDS on the pinch use and undercut to access the slab and trend rightward to finish via a good hold or at the same grade finish Direct using a good hold further left.
  • Slab via the flake
  • Sit start from the mini roof and up via the flake
Neat Wall
1
2
Neat Wall 2 / 2