Den grønne mil
1
Den grønne mil 1 / 2
  • sds on ok hold under overhang. Then go right until overhanging arete. Follow arete out left until drop off on good hold on top of the slab.
Den grønne mil
1
Den grønne mil 2 / 2
  • sds on ok hold under overhang. Then go right until overhanging arete. Follow arete out left until drop off on good hold on top of the slab.